Upper American River Project: stream flow and reservoir conditions
As a requirement of the operating License for the Upper American River Project, SMUD is releasing pulse flow events into the South Fork of Silver Creek below Ice House Reservoir dam and into Gerle Creek below Loon Lake Reservoir dam. The Ice House release is scheduled from May 11-16, 2022, and the Loon Lake release is scheduled from May 21-26, 2022. Note that the Ice House release will coincide with two days of recreation stream flows. All people in the vicinity of these affected waterways during the pulse flow releases should use extreme caution, as water levels may suddenly rise.
Scheduled recreation stream flows below Slab Creek Dam have been canceled for the 2022 season due to a water temperature threshold exceedance, designed to protect foothill yellow-legged frog breeding activities.
SMUD owns and operates the Upper American River Project (UARP), located on the western slope of the Sierra Nevada. The UARP lies within El Dorado and Sacramento counties, primarily within lands of the Eldorado National Forest. The project is a large hydroelectric development composed of several reservoirs and powerhouses located along streams and rivers within the American River basin. Recreational facilities have been developed around the Project storage reservoirs, mostly in an area commonly referred to as the Crystal Basin Recreation Area.
2022 Recreation Streamflow Schedule
Review the hydro relicensing compliance information in support of our 50-year license to operate the UARP.
Based on the ongoing heavy construction activities at the South Fork Powerhouse, public vehicular access to Slab Creek Reservoir via Slab Creek Dam road is restricted over the next couple months.
We’re making improvements
Over the next few years, many of the Crystal Basin Recreational Areas will be upgraded with new features for your enjoyment. However, the work will require some sites to be partially or completely closed during renovations. Please view the closure map for a schedule and information to help with your planning.
View the latest recorded stream flows and reservoir elevations
Streams
- Brush Creek
- Gerle Creek (below Gerle Creek Dam)
- Gerle Creek (below Loon Lake Dam)
- Little Rubicon River
- Rubicon River (below Rubicon Dam)
- Silver Creek (below Camino Dam)
- Silver Creek (below Junction Dam)
- Silver Creek (south fork below Ice House Dam)
- South Fork, American River (below South Fork Powerhouse)
- South Fork, American River (below Chili Bar Dam)
- South Fork, Rubicon River (below Robbs Peak Dam)
Reservoirs
- Brush Creek Reservoir
- Chili Bar Reservoir
- Gerle Creek Reservoir
- Ice House Reservoir
- Junction Reservoir
- Loon Lake Reservoir
- Rubicon Reservoir
- Slab Creek Reservoir
- Union Valley Reservoir
Disclaimer: Neither SMUD nor PG&E assumes any legal responsibility for the accuracy of the information on this site. The information consists of estimates of stream flows and reservoir levels. Actual stream flows and reservoir levels may vary significantly from the estimates provided. Many factors affect flows and reservoir levels, including weather, snowmelt runoff, and the operating requirements of the hydro project. Reservoir and river recreation can be hazardous. Recreationists have the sole responsibility to determine whether conditions are safe to enter the water, and they thereby assume full risk of serious bodily injury.
Resources
- Download streamflow release information
- Chili Bar whitewater recreational flow schedule
- Water year type (Bulletin 120) (Updated May 9, 2022)
"PG&E" refers to the Pacific Gas and Electric Company, a subsidiary of PG&E Corporation. © Pacific Gas and Electric Company. All rights reserved.