2026 emission thiab xoom-carbon program cov ntaub ntawv

Kawm paub txog qhov kev vam meej uas peb tab tom ua rau peb lub hom phiaj 2030 muab lub zog tsis muaj carbon rau peb cov neeg siv khoom.

Cov ntaub ntawv no yog rau cov ntaub ntawv xov xwm nkaus xwb, thiab yuav tsum tsis txhob siv rau lub hom phiaj npaj. Cov ntaub ntawv raug hloov pauv yam tsis tau ceeb toom. 

Kawm paub txog peb 2030 Lub Zeem Muag Lub Zog
2023 Zero Carbon Plan Progress Report

Peb lub hlis twg tiam thiab emissions los ntawm cov nroj tsuag roj

  Lub zog tsim los ntawm cov nroj tsuag roj peb tswj hauv 2026

1,205
(GWh)
Q1 2026

 

---
(GWh)
Q2 2026

 

---
(GWh)
Q3 2026

 

---
(GWh)
Q4 2026

Peb cia siab tias yuav tsim tau 6,028 GWh ntawm lub zog los ntawm cov nroj tsuag roj uas peb tswj tau hauv 2026.
 

CO2 Gas cog emissions rau load thiab khw muag khoom *
Bar chart titled '2026 Planned GHG = 1.6 million metric tons' showing greenhouse gas emissions contributions for Q1 2026. Planned emissions and cumulative emissions are shown as light blue and green bars, respectively. Three emission sources are also shown for the same quarter: Thermal Plant Contract in orange, Cosumnes Power Plant in blue, and Cogeneration and Peaker Plants in yellow. All values appear below 500 thousand metric tons. No data is shown for Q2 through Q4 of 2026. See table below for detailed information. 

 

  Q1 2026 Q2 2026 Q3 2026 Q4 2026
Thermal cog cog 34k MT CO2e --- MT CO2e --- MT CO2e --- MT CO2e
Cosumnes Power Plant 374k MT CO2e --- MT CO2e --- MT CO2e --- MT CO2e
Cogens thiab cov paj ntoo 59k MT CO2e --- MT CO2e --- MT CO2e --- MT CO2e
 Tag nrho 467k MT CO2e --- MT CO2e --- MT CO2e --- MT CO2e

Nco tseg: Cosumnes Power Plant thiab cogen thiab peaker nroj tsuag yog SMUD-muaj peev txheej.

SMUD 's GHG emissions yog kwv yees raws li tus nqi ntawm lub zog tsim tawm ntawm  SMUD cov pa roj thiab hluav taws xob yuav los ntawm Calpine Sutter roj cog. Cov phiaj xwm thiab qhov tseeb GHG emissions los ntawm peb cov fossil fuel generation qhia txog tag nrho cov emissions los pab SMUD cov neeg siv khoom xav tau lub zog thiab kev muag khoom lag luam los txhawb California thiab lwm lub xeev nyob ze . GHG emissions raug kwv yees siv cov pa hluav taws xob tsis ntev los no uas tau raug txheeb xyuas raws li California Air Resources Board (CARB) Cov Cai Qhia Txog Cov Cai (MRR).

Saib peb lub zog cov ntsiab lus daim ntawv lo


Solar thiab cia installation

 
""
Tag nrho hnub ci kev teeb tsa *

Tshaj li 58,000 cov neeg siv khoom tau teeb tsa lub hnub ci ru tsev, tag nrho ntau dua 387 MW ntawm lub zog hauv SMUD thaj chaw.

Bar chart titled 'Solar installations (Residential + commercial)' showing retrofit, new construction, and cumulative installation counts for 2025 and the first quarter of 2026. For 2025, retrofit installations total 1,237, new construction installations total 4,862, and cumulative installations total 6,103. For Q1 2026, retrofit installations are 368, new construction installations are 796, and cumulative installations total 1,164. No data is shown for Q2 through Q4 of 2026. Retrofit is represented by blue‑green bars, new construction by yellow‑green bars, and cumulative totals by blue bars. 

* Cov no yog ua tiav / nruab tshuab. SMUD tau tshuaj xyuas lub xaib thiab tau txais kev pom zoo rau lub kaw lus ua haujlwm.

 

""
Tag nrho cov roj teeb cia kev teeb tsa

Tshaj li 2,000 cov neeg siv khoom tau teeb tsa lub roj teeb cia, tag nrho ntau dua 13 MW ntawm kev cia hauv SMUD thaj chaw.

Bar chart titled 'Battery storage installations (Residential + commercial)' showing actual and cumulative installations for 2025 and the first quarter of 2026. For 2025, the cumulative total is 1,237 installations. For Q1 2026, actual installations and cumulative installations are both 633. No data is shown for Q2 through Q4 of 2026. The actual values are displayed in yellow‑green bars, and the cumulative values are shown in blue bars. 

 

Zero carbon program thiab qhov project xwm txheej

Peb yuav ua tiav peb lub hom phiaj 2030 los ntawm kev ua tiav ntawm cov haujlwm sib txawv, cov haujlwm thiab cov haujlwm. Utility-scale tej yaam num yuav pab xyuas kom peb muaj peev xwm txuas ntxiv muab kev nyab xeeb, txhim khu kev qha kev pab cuam siv carbon dawb zog.

Kev koom tes hauv cov neeg siv khoom hauv tsev thiab kev lag luam yuav pab peb txuas qhov sib txawv kom ua tau raws li peb lub hom phiaj thiab pab txhim kho peb cov huab cua hauv cheeb tsam. Kev saws me nyuam yog nyob ntawm ntau yam. Cov naj npawb kev koom tes yuav sib txawv peb lub hlis twg rau lub hlis twg nyob ntawm cov xwm txheej no.

Peb suav tag nrho cov hluav taws xob sib npaug hauv tsev los ntawm kev sib txuas cov haujlwm hluav taws xob xws li lub twj tso kua mis HVAC ntawm ib lub tsev, lub twj tso kua mis dej rhaub dej kub los ntawm lwm lub tsev thiab lub induction cooktop los ntawm lwm lub tsev. Ntxiv ua ke, lawv ua ib qho hluav taws xob sib npaug hauv tsev. Peb kuj suav nrog 100% tag nrho cov hluav taws xob ib tsev neeg thiab ntau tsev neeg.

Line chart titled '2026 All-electric Equivalent Homes' comparing the 2026 program plan with year‑to‑date actual progress from January through December. The planned values, shown in blue, rise gradually from 74.5 thousand homes in January to 79.0 thousand in December. Actual values, shown in yellow‑green, are available only through March, increasing slightly from 74.2 thousand in January to 74.7 thousand in March. After March, only the planned values continue, progressing steadily each month toward the year‑end target.   Txhua lub tsev hluav taws xob los ntawm 2030 

 

  2025
kawg
Q1
2026 
Q2
2026
Q3
2026
Q4
2026
2026
lub hom phiaj
Thaum tshav kub kub twj tso kua mis HVAC conversion 3,797 738 --- --- --- 4,870
Kub twj tso kua mis dej rhaub conversion 789 300 --- --- --- 914
Gas-to-electric induction cooktop conversions n/a 64 --- --- --- 410
Electric-to-electric induction cooktop conversions n/a 33 --- --- --- 200
Txhua-hluav taws xob tshiab lub tsev & ntau tsev neeg ua tsev 2,208 45 --- --- --- 1,179
Multifamily units retrofitted 384 0 --- --- --- 249
All-electric equivalent tsev (cumulative) 73,617 74,666 --- --- --- 79,045

 Line chart titled '2026 Distributed Energy Resources (DER)' comparing the program plan with year‑to‑date actual progress from January through December. The planned values, shown in blue, rise steadily from 80.0 in January to 95.8 in December. Actual values, shown in yellow‑green, are available for January through March, increasing from 78.7 in January to 80.2 in March. After March, only the planned values continue, showing a gradual month‑to‑month increase ending at 95.8 in December.   DER los ntawm 2030 

 

  2025
kawg
Q1
2026
Q2
2026
Q3
2026
Q4
2026
2026
lub hom phiaj
My Energy Optimizer® Tus Tswv Cuab (sau cov ntsuas ntsuas ntsuas ntsuas tau sau npe) 38,080 39,326 --- --- --- 42,000
My Energy Optimizer Partner (MW cuv npe) 29.7 30.7 --- --- --- 33
My Energy Optimizer Partner + (Tesla roj teeb) 1,568 2,252 --- --- --- 1,870
My Energy Optimizer Tshaj Plaws (Tus Khub Ua Haujlwm Zoo Tshaj Plaws rau Tesla MW)
8.46 12.2 --- --- --- 10.1
My Energy Optimizer Partner + (Cov roj teeb uas tsis yog Tesla)
88 130 --- --- --- 130
My Energy Optimizer Tshaj Plaws (Tsis Yog Tesla MW Rau Npe)
0.29 0.5 --- --- --- 0.5
My Energy Optimizer Pib / TOD Optimized (TOD-optimized roj teeb) 387 1,479 --- --- --- 6,687
My Energy Optimizer Pib / TOD Optimized (MW optimized) 6.93 7.4 --- --- --- 16.7
Peak Conserve los yog NextGen ACLM (cov neeg siv khoom siv rau npe)
1,749 1,304 --- --- --- ---
Peak Conserve lossis NextGen ACLM (MW rau npe) 1.38 1 --- --- --- ---
Commercial PowerDirect (Cov neeg siv khoom npe) 41 36 --- --- --- 36
Commercial PowerDirect (MW rau npe) 28.5 21.9 --- --- --- 21.9
Residential Managed Charging (Cov neeg siv khoom npe)
n/a -- -- -- -- ---
Tag nrho cov peev xwm (MW) * 77.56 76 --- --- --- 84.5

* Tag nrho MW suav nrog txhua qhov kev pabcuam Load Flexibility, suav nrog StorageShares

Line chart titled '2026 Electric Vehicles' comparing the program plan with year‑to‑date actual progress from January through December. The planned values, shown in blue, rise steadily from 79.8 thousand vehicles in January to 94.0 thousand in December. Actual values, shown in yellow‑green, are available for January through March, increasing from 77.1 thousand in January to 78.2 thousand in March. After March, only the planned values continue, showing a consistent month‑to‑month increase ending at 94.0 thousand in December.
  EV los ntawm 2030 

 

  2025
kawg
Q1
2026
Q2
2026
Q3
2026
Q4
2026
2026
lub hom phiaj
Chaw nyob EV chargers ntsia (rebates tawm) 2,556 273 --- --- --- 1,465
Kev lag luam EV chargers ntsia (rebates tawm) 621 36 --- --- --- 661
Cov neeg nyob hauv EV Rate cov neeg koom nrog (sau) 36,028 37,000 --- --- --- 44,609
E-Fuel Solutions tej yaam num 4 --- --- --- --- 3
Tus naj npawb ntawm lub luag haujlwm EV hauv thaj chaw pabcuam (sib sau ua ke) 76,385 78,254 --- --- --- 94,000

Txhawm rau pab peb ua tiav peb lub hom phiaj ntawm lub zog tsis muaj cov pa roj carbon monoxide los ntawm 2030, peb tab tom ua haujlwm rau ntau yam kev siv hluav taws xob ua haujlwm kom nce peb cov khoom siv hluav taws xob tsis muaj roj carbon thiab txhim kho kev ntseeg tau. Hauv qab no yog cov haujlwm peb tab tom ua haujlwm tam sim no lossis tau ua tiav.

 

Summary of renewable energy projects, capacity and details
xwm txheej Qhov project npe Ntxiv peev xwm Zog qhov chaw Kev piav qhia
Hauv Kev Txhim Kho Lub teb chaws Acre 344 MW/
172 MW
Solar/Storage
(Local – Placer County, CA)
SMUD Board approved the Final EIR on April 20, 2023. Placer Planning Commission and Placer Conservation Authority Approved the Project and Mitigation Agreement on January 11 & 17, 2024, respectively. The Board of Supervisor approved the project on February 20, 2024. This is a SMUD developed project with a 3rd party power purchase agreement. Construction is underway and the project is scheduled to be online in 2027. Annual generation is estimated to be 637,000 MWhs and greenhouse gas reduction is estimated to be approximately 248,000 metric tons.
Canceled Coyote Creek 200 MW/
100 MW
Solar/Storage
(Local – Sacramento County, CA)
On January 5, 2026, SMUD announced it was cancelling the power purchase agreement with DE Shaw for the procurement of energy for the Coyote Creek project due to project uncertainties including supply chain constraints, rising prices, tariffs, schedule delays, environmental impacts and pending litigation.
Under Evaluation Curry Creek (Formerly Country Acres II) 156 MW / 156 MW-4teev Solar/Storage
(Local – Placer County, CA)
SMUD is the lead agency for developing this project. Permitting activities are in progress. The project timeline and contracting model are under evaluation. Annual generation is estimated to be 442,000 MWhs and greenhouse gas reduction is estimated to be approximately 172,000 metric tons.
Hauv Kev Txhim Kho Kev hlub 70 MW Solar
(Regional – Riverside County, CA)
A 3rd party power purchase agreement for a 20-year term beginning December 2027 for 70 MW of renewable solar photovoltaic power from the Grace Orchard Energy Center Solar Project in Riverside County, CA. Annual generation is estimated to be 147,000 MWhs and greenhouse gas reduction is estimated to be approximately 57,000 metric tons.
Ua kom tiav (2025) Hatchet Ridge 101.2 MW Wind
(Regional – Shasta County, CA)
A 3rd party power purchase agreement for a 7-year term beginning December 2025 for 101.2 MW of renewable wind power from the Hatchet Ridge Wind Project in Shasta County, CA. Annual generation is estimated to be 275,000 MWhs and greenhouse gas reduction is estimated to be approximately 107,000 metric tons.
Under Evaluation Oveja Ranch 75 MW / 37 MW- 4hr Solar/Storage
(Local – Sacramento County, CA)
SMUD is the lead agency for developing this project. Permitting is complete. CEQA draft EIR was released in March and public meeting was held early April 2025. The FEIR was approved by the SMUD Board on 9/18/25. Sacramento County Board of Supervisors approved the Williamson Act contract amendment on 9/4/25. 30% design is complete. The project timeline and contracting model are under evaluation. Annual generation is estimated to be 190,000 MWhs and greenhouse gas reduction is estimated to be approximately 74,000 metric tons.
Ua kom tiav (2025) Sloughhouse 50 MW Solar
(Local – Sacramento County, CA)
SMUD is in contract with DE Shaw for the procurement of energy for the Sloughhouse project. The scope of the project is a 50 MW solar installation. Construction was completed in 2025 and the plant is operational. Annual generation is estimated to be 138,000 MWhs and greenhouse gas reduction is estimated to be approximately 54,000 metric tons.
Under Evaluation Solano 5 (Solano 2 Lub zog) 94.5 MW Wind
(Regional – Solano County, CA)
SMUD is the lead agency for developing this project. Permitting activities are in progress. The project timeline and contracting model are under evaluation. The project scope includes decommissioning Solano 2 by removing 29 old wind turbines and installing 21 new turbines. Planning and preliminary engineering underway. Annual generation is estimated to be 327,000 MWhs (an 80% increase in energy production) and greenhouse gas reduction is estimated to be approximately 128,000 metric tons.
Hauv Kev Txhim Kho Sunzia 150 MW Wind
(Regional – New Mexico)
A 3rd party power purchase agreement for a 15-year term beginning April 2026 for 150 MW of renewable wind power at the SunZia Wind Project in New Mexico. The developer holds firm transmission rights to deliver to the California Independent System Operator (CAISO) intertie where SMUD takes delivery. Annual generation is estimated to be 488,000 MWhs and greenhouse gas reduction is estimated to be approximately 190,000 metric tons.
Hauv Kev Txhim Kho Terra-Gen 46 MW Solar
(Regional – Kern County, CA)
A 3rd party power purchase agreement for an 8-year term beginning January 2027 for 46 MW of renewable solar photovoltaic power from the Sanborn 2 PV I LLC Project (S2PVI Project) in Kern County, CA. Annual generation is estimated to be 125,000 MWhs and greenhouse gas reduction is estimated to be approximately 49,000 metric tons.
Ua kom tiav (2024) Solano 4 85.5 MW Wind
(Regional – Solano County, CA)
The project scope included decommissioning Solano 1 by removing 23 wind turbines in April 2023. The project scope also included the installation of 21 wind turbines (9 in Solano 4 East and 10 in Solano 4 West). Construction on the new turbines started in April 2023 and completed in May 2024. Annual generation is estimated to be approximately 232,000 MWhs and greenhouse gas reduction is estimated to be approximately 90,000 metric tons. With the completion of the Solano 4 project, SMUD Solano Assets (Solano 2, 3 & 4) have a total installed capacity of 300 MW.
Ua kom tiav (2023) Hedge 4 MW Battery Storage
(Local – Sacramento County, CA)
Kev lag luam kev lag luam ntawm Hedge Lithium-Ion Battery Energy Storage System tau pib thaum Lub Ib Hlis 2023. Lub kaw lus yuav muab 4 MW hluav taws xob thiab 8 MW-teev chaw cia khoom uas tuaj yeem siv tau thaum lwm qhov kev siv hluav taws xob raug strained - txaus rau lub zog 800 lub tsev rau 2 teev nrog lub zog huv, rov ua dua tshiab.
Complete (2023 & 2026) Calpine 100 to 150 MW Geothermal
(Regional – Lake County, CA)
January 2023 marked the beginning of the 10-year PPA of energy from Calpine’s operations at The Geysers, which added 100 MWs of geothermal energy to SMUD’s portfolio. In January 2026 the contract was expanded by 50 MW for a total of 150 MW and extended through 2042. The Geysers is the single largest geothermal electric operation in the world. Annual generation is estimated to be 1,314,000 MWhs and greenhouse gas reduction is estimated to be approximately 504,000 metric tons.
Ua kom tiav (2022) Drew Solar 100 MW Solar
(Regional – Imperial County, CA)
The Drew Solar Project, completed in 2022, is a 30-year Power Purchase Agreement (PPA) for 100 MW Solar located in Imperial County. Annual generation is estimated to be 282,000 MWhs and greenhouse gas reduction is estimated to be approximately 121,000 metric tons.

Xav paub ntau ntxiv txog peb cov neeg siv khoom siv hluav taws xob ntau npaum li cas thiab lub zog los ntawm qhov twg.

Saib tam sim no thiab xav tau kev siv zog

Cov ntaub ntawv xyoo dhau los

Koj tuaj yeem pom cov ntaub ntawv los ntawm xyoo dhau los ntawm nplooj ntawv hauv qab no: