2026排放和零碳計劃信息

了解我們在實現為客戶提供無碳電力的2030目標方面所取得的進展。

此數據僅用於信息目的,不應用於計劃目的。數據如有更改,恕不另行通知。 

了解我們的2030清潔能源願景
2023零碳計畫進度報告

天然氣工廠的季度發電量和排放量

  我們在2026控制的天然氣發電廠所產生的能源

1 、 205
(吉瓦時)
Q 1 2026

 

---
(GWh)
Q 2 2026

 

---
(GWh)
Q 3 2026

 

---
(吉瓦時)
問4 2026

我們預計從我們在2026控制的天然氣發電廠產生6 , 028 GWh 的能源。
 

一氧化碳2 燃氣廠負荷和市場銷售排放量*
Bar chart titled '2026 Planned GHG = 1.6 million metric tons' showing greenhouse gas emissions contributions for Q1 2026. Planned emissions and cumulative emissions are shown as light blue and green bars, respectively. Three emission sources are also shown for the same quarter: Thermal Plant Contract in orange, Cosumnes Power Plant in blue, and Cogeneration and Peaker Plants in yellow. All values appear below 500 thousand metric tons. No data is shown for Q2 through Q4 of 2026. See table below for detailed information. 

 

  問1 2026 問2 2026 問3 2026 問4 2026
熱電廠合約 34 k MT CO 2 e --- MT CO2e --- MT CO2e --- MT CO2e
科蘇姆內斯發電廠 374 k MT CO 2 e --- MT CO2e --- MT CO2e --- MT CO2e
強電和峰值裝置 59 k MT CO 2 e --- MT CO2e --- MT CO2e --- MT CO2e
 全部的 467 k MT CO 2 e --- MT CO2e --- MT CO2e --- MT CO2e

註:Cosumnes 發電廠以及熱電聯產和調峰發電廠是 SMUD 擁有的資源。

SMUD的溫室氣體排放量是根據SMUD天然氣廠的發電量和從 Calpine Sutter 天然氣廠購買的電力估算的。我們化石燃料發電的計劃和實際溫室氣體排放量反映了滿足SMUD客戶能源需求和支持加州及其他鄰近環州的市場銷售的總排放量。溫室氣體排放量是使用根據加州空氣資源委員會 (CARB) 強制報告條例 (MRR) 驗證的最新排放因子來估算的。

查看我們的電源內容標籤


太陽能和儲存裝置

 
””
太陽能裝置總數*

超過58個客戶已安裝了000屋頂太陽能,SMUD 地區的總能源超過387 MW。

Bar chart titled 'Solar installations (Residential + commercial)' showing retrofit, new construction, and cumulative installation counts for 2025 and the first quarter of 2026. For 2025, retrofit installations total 1,237, new construction installations total 4,862, and cumulative installations total 6,103. For Q1 2026, retrofit installations are 368, new construction installations are 796, and cumulative installations total 1,164. No data is shown for Q2 through Q4 of 2026. Retrofit is represented by blue‑green bars, new construction by yellow‑green bars, and cumulative totals by blue bars. 

*這些是已完成/已安裝的系統。 SMUD 已檢查現場並批准該系統運作。

 

””
電池儲存裝置總數

超過2個客戶已安裝了000電池存儲,SMUD 地區的存儲總量超過13 MW。

Bar chart titled 'Battery storage installations (Residential + commercial)' showing actual and cumulative installations for 2025 and the first quarter of 2026. For 2025, the cumulative total is 1,237 installations. For Q1 2026, actual installations and cumulative installations are both 633. No data is shown for Q2 through Q4 of 2026. The actual values are displayed in yellow‑green bars, and the cumulative values are shown in blue bars. 

 

零碳計劃和項目狀況

我們將透過不同項目、計劃和活動的成功來實現我們的2030目標。 公用事業規模的專案將有助於確保我們能夠繼續使用無碳能源提供安全、可靠的服務。

參與住宅和商業客戶計畫將幫助我們縮小差距,實現我們的目標,並有助於改善我們的區域空氣品質。 計劃的採用取決於多種因素。 根據這些因素,參與人數可能會因季度而異。

我們透過結合電氣化專案(例如一個家庭的熱泵暖通空調、另一個家庭的熱泵熱水器和另一個家庭的電磁爐)來計算全電等效家庭。 它們加在一起就構成了一個等效的全電動住宅。 我們還包括100 % 的全電動單戶住宅和多戶住宅。

Line chart titled '2026 All-electric Equivalent Homes' comparing the 2026 program plan with year‑to‑date actual progress from January through December. The planned values, shown in blue, rise gradually from 74.5 thousand homes in January to 79.0 thousand in December. Actual values, shown in yellow‑green, are available only through March, increasing slightly from 74.2 thousand in January to 74.7 thousand in March. After March, only the planned values continue, progressing steadily each month toward the year‑end target.   2030之前的所有電動住宅 

 

  2025
決賽
問1
2026 
問2
2026
問3
2026
問4
2026
2026
目標
熱泵暖通空調轉換 3 、 797 738 --- --- --- 4 、 870
熱泵熱水器改造 789 300 --- --- --- 914
Gas-to-electric induction cooktop conversions 不適用 64 --- --- --- 410
Electric-to-electric induction cooktop conversions 不適用 33 --- --- --- 200
興建全電動新住宅及多戶住宅 2 、 208 45 --- --- --- 1 、 179
多戶單元改造 384 0 --- --- --- 249
全電等效家庭(累計) 73 、 617 74 、 666 --- --- --- 79 、 045

 Line chart titled '2026 Distributed Energy Resources (DER)' comparing the program plan with year‑to‑date actual progress from January through December. The planned values, shown in blue, rise steadily from 80.0 in January to 95.8 in December. Actual values, shown in yellow‑green, are available for January through March, increasing from 78.7 in January to 80.2 in March. After March, only the planned values continue, showing a gradual month‑to‑month increase ending at 95.8 in December.   DER 由2030 

 

  2025
決賽
問1
2026
問2
2026
問3
2026
問4
2026
2026
目標
My Energy Optimizer®合作夥伴 (累計加入的智慧型恆溫器) 38 、 080 39 、 326 --- --- --- 42 、 000
My Energy Optimizer 合作夥伴 (已註冊 MW) 29 。 7 30 。 7 --- --- --- 33
My Energy Optimizer Partner+ (Tesla 電池) 1 、 568 2 、 252 --- --- --- 1 、 870
My Energy Optimizer合作夥伴+(已註冊特斯拉MW)
8 。 46 12 。 2 --- --- --- 10 。 1
My Energy Optimizer Partner+ (非特斯拉電池)
88 130 --- --- --- 130
My Energy Optimizer合作夥伴+(非特斯拉MW註冊用戶)
0 。 29 0 。 5 --- --- --- 0 。 5
My Energy Optimizer Starter/TOD Optimized (TOD 優化電池) 387 1 、 479 --- --- --- 6 、 687
My Energy Optimizer Starter/TOD Optimized (MW 已優化) 6 。 93 7 。 4 --- --- --- 16 。 7
Peak Conserve 或 NextGen ACLM (已註冊的客戶裝置)
1 、 749 1 、 304 --- --- --- ---
Peak Conserve 或 NextGen ACLM (MW 已加入) 1 。 38 1 --- --- --- ---
商用電源直接 (已註冊的客戶) 41 36 --- --- --- 36
商用電源直接 (已註冊 MW) 28 。 5 21 。 9 --- --- --- 21 。 9
住宅管理充電(客戶註冊)
不適用 -- -- -- -- ---
總容量 (兆瓦) * 77 。 56 76 --- --- --- 84 。 5

* 總 MW 包括所有負載靈活性程序,包括存儲共享

Line chart titled '2026 Electric Vehicles' comparing the program plan with year‑to‑date actual progress from January through December. The planned values, shown in blue, rise steadily from 79.8 thousand vehicles in January to 94.0 thousand in December. Actual values, shown in yellow‑green, are available for January through March, increasing from 77.1 thousand in January to 78.2 thousand in March. After March, only the planned values continue, showing a consistent month‑to‑month increase ending at 94.0 thousand in December.
  電動車由2030提供 

 

  2025
決賽
問1
2026
問2
2026
問3
2026
問4
2026
2026
目標
安裝住宅電動車充電器(發放回扣) 2 、 556 273 --- --- --- 1 、 465
安裝商用電動車充電器(發放回扣) 621 36 --- --- --- 661
住宅電動車費率參與者(累計) 36 、 028 37 、 000 --- --- --- 44 、 609
電子燃料解決方案項目 4 --- --- --- --- 3
服務區域內的輕型電動車數量(累積) 76 、 385 78 、 254 --- --- --- 94 、 000

為了幫助我們在2030之前實現無碳電力的目標,我們正在進行各種公用事業規模的項目,以增加我們的無碳能源組合併提高可靠性。 以下是我們目前正在進行或已完成的項目。

 

Summary of renewable energy projects, capacity and details
地位 專案名 增加容量 能量源 描述
進行中 鄉村英畝 344兆瓦/
172兆瓦
Solar/Storage
(Local – Placer County, CA)
SMUD Board approved the Final EIR on April 20, 2023. Placer Planning Commission and Placer Conservation Authority Approved the Project and Mitigation Agreement on January 11 & 17, 2024, respectively. The Board of Supervisor approved the project on February 20, 2024. This is a SMUD developed project with a 3rd party power purchase agreement. Construction is underway and the project is scheduled to be online in 2027. Annual generation is estimated to be 637,000 MWhs and greenhouse gas reduction is estimated to be approximately 248,000 metric tons.
Canceled 土狼溪 200兆瓦/
100兆瓦
Solar/Storage
(Local – Sacramento County, CA)
On January 5, 2026, SMUD announced it was cancelling the power purchase agreement with DE Shaw for the procurement of energy for the Coyote Creek project due to project uncertainties including supply chain constraints, rising prices, tariffs, schedule delays, environmental impacts and pending litigation.
Under Evaluation Curry Creek (Formerly Country Acres II) 156 兆瓦/156 兆瓦-4 小時 Solar/Storage
(Local – Placer County, CA)
SMUD is the lead agency for developing this project. Permitting activities are in progress. The project timeline and contracting model are under evaluation. Annual generation is estimated to be 442,000 MWhs and greenhouse gas reduction is estimated to be approximately 172,000 metric tons.
進行中 恩典 70兆瓦 Solar
(Regional – Riverside County, CA)
A 3rd party power purchase agreement for a 20-year term beginning December 2027 for 70 MW of renewable solar photovoltaic power from the Grace Orchard Energy Center Solar Project in Riverside County, CA. Annual generation is estimated to be 147,000 MWhs and greenhouse gas reduction is estimated to be approximately 57,000 metric tons.
完成 ( 2025 ) 哈切特嶺 101.2 兆瓦 Wind
(Regional – Shasta County, CA)
A 3rd party power purchase agreement for a 7-year term beginning December 2025 for 101.2 MW of renewable wind power from the Hatchet Ridge Wind Project in Shasta County, CA. Annual generation is estimated to be 275,000 MWhs and greenhouse gas reduction is estimated to be approximately 107,000 metric tons.
Under Evaluation 奧維亞牧場 75 MW / 37 MW- 4hr Solar/Storage
(Local – Sacramento County, CA)
SMUD is the lead agency for developing this project. Permitting is complete. CEQA draft EIR was released in March and public meeting was held early April 2025. The FEIR was approved by the SMUD Board on 9/18/25. Sacramento County Board of Supervisors approved the Williamson Act contract amendment on 9/4/25. 30% design is complete. The project timeline and contracting model are under evaluation. Annual generation is estimated to be 190,000 MWhs and greenhouse gas reduction is estimated to be approximately 74,000 metric tons.
完成 ( 2025 ) 斯勞豪斯 50兆瓦 Solar
(Local – Sacramento County, CA)
SMUD is in contract with DE Shaw for the procurement of energy for the Sloughhouse project. The scope of the project is a 50 MW solar installation. Construction was completed in 2025 and the plant is operational. Annual generation is estimated to be 138,000 MWhs and greenhouse gas reduction is estimated to be approximately 54,000 metric tons.
Under Evaluation 索拉諾 5 (索拉諾 2 重力) 94.5 兆瓦 Wind
(Regional – Solano County, CA)
SMUD is the lead agency for developing this project. Permitting activities are in progress. The project timeline and contracting model are under evaluation. The project scope includes decommissioning Solano 2 by removing 29 old wind turbines and installing 21 new turbines. Planning and preliminary engineering underway. Annual generation is estimated to be 327,000 MWhs (an 80% increase in energy production) and greenhouse gas reduction is estimated to be approximately 128,000 metric tons.
進行中 桑齊亞 150兆瓦 Wind
(Regional – New Mexico)
A 3rd party power purchase agreement for a 15-year term beginning April 2026 for 150 MW of renewable wind power at the SunZia Wind Project in New Mexico. The developer holds firm transmission rights to deliver to the California Independent System Operator (CAISO) intertie where SMUD takes delivery. Annual generation is estimated to be 488,000 MWhs and greenhouse gas reduction is estimated to be approximately 190,000 metric tons.
進行中 地下一代 46兆瓦 Solar
(Regional – Kern County, CA)
A 3rd party power purchase agreement for an 8-year term beginning January 2027 for 46 MW of renewable solar photovoltaic power from the Sanborn 2 PV I LLC Project (S2PVI Project) in Kern County, CA. Annual generation is estimated to be 125,000 MWhs and greenhouse gas reduction is estimated to be approximately 49,000 metric tons.
完成 ( 2024 ) 索拉諾4 85.5 兆瓦 Wind
(Regional – Solano County, CA)
The project scope included decommissioning Solano 1 by removing 23 wind turbines in April 2023. The project scope also included the installation of 21 wind turbines (9 in Solano 4 East and 10 in Solano 4 West). Construction on the new turbines started in April 2023 and completed in May 2024. Annual generation is estimated to be approximately 232,000 MWhs and greenhouse gas reduction is estimated to be approximately 90,000 metric tons. With the completion of the Solano 4 project, SMUD Solano Assets (Solano 2, 3 & 4) have a total installed capacity of 300 MW.
完成 ( 2023 ) 樹籬 4兆瓦 Battery Storage
(Local – Sacramento County, CA)
對沖鋰離子電池儲能系統於 1 月 2023 開始商業運營。該系統將提供 4 兆瓦的電力和 8 兆瓦小時的儲存空間,當其他能源受到壓力時,可以利用清潔的可再生能源為 800 家庭供電 2 小時。
Complete (2023 & 2026) 卡爾派恩 100 to 150 MW Geothermal
(Regional – Lake County, CA)
January 2023 marked the beginning of the 10-year PPA of energy from Calpine’s operations at The Geysers, which added 100 MWs of geothermal energy to SMUD’s portfolio. In January 2026 the contract was expanded by 50 MW for a total of 150 MW and extended through 2042. The Geysers is the single largest geothermal electric operation in the world. Annual generation is estimated to be 1,314,000 MWhs and greenhouse gas reduction is estimated to be approximately 504,000 metric tons.
完成 ( 2022 ) 德魯索拉 100兆瓦 Solar
(Regional – Imperial County, CA)
The Drew Solar Project, completed in 2022, is a 30-year Power Purchase Agreement (PPA) for 100 MW Solar located in Imperial County. Annual generation is estimated to be 282,000 MWhs and greenhouse gas reduction is estimated to be approximately 121,000 metric tons.

想要詳細了解我們的客戶使用了多少電量以及電力來自何處。

查看當前和預期的能源使用情況

上一年資訊

您可以在以下頁面上找到過去幾年的信息: