To help maintain grid reliability and provide our community with carbon-free energy, we’re proposing to construct and operate a photovoltaic (PV) solar power and battery storage facility in southern Sacramento County that would provide 75 megawatts (MW) of clean, renewable energy that aligns with our 2030 Zero Carbon Plan and enhances grid resiliency.
Запропонований проект підтримає зростаючий попит на електроенергію внаслідок зростання та розвитку південно-східного округу Сакраменто та прилеглих територій.
It would also add to our diverse clean energy portfolio, improve local air quality and deliver a reliable, long-term supply of economically viable solar energy and battery storage that provides grid resiliency, while continuing existing agricultural activities.
Project benefits include:
- Construction expected to support 230 jobs and contribute $38 million to the Sacramento County local economy.
- Once operational, Oveja Ranch is expected to contribute $3.8 million to the Sacramento County local economy and $11.7 million statewide each year.
- Additional statewide benefits include 580 jobs and $123 million to the state economy during construction.
Діяльність та місце роботи
Запропонована ділянка буде забудована на території площею до 400 акрів у південно-східному окрузі Сакраменто, на південь від міста Ранчо Кордова та на північ від Вілтона. На додаток до фотоелектричної сонячної енергії та накопичувача акумуляторів, проект включатиме генеруючу підстанцію та лінії підключення до нашої мережі. Наприкінці життєвого циклу проекту (очікується 30-35 років) ділянку буде виведено з експлуатації.
Хронологія
Будівництво розпочнеться вже в3 кварталі 2026 , а комерційна експлуатація планується на 2028.
Ми прагнемо інформувати спільноту про цей проект і будемо оновлювати цю сторінку з інформацією про розклад, вплив будівництва та оновлення прогресу.
Які екологічні міркування?
We’ve prepared an Environmental Impact Report (EIR) to satisfy the requirements of the California Environmental Quality Act (CEQA) (Public Resources Code [PRC] Section 21000 et seq.) and serve as the lead agency for CEQA compliance. The EIR discloses environmental impacts, identifies mitigation measures for reducing or avoiding impacts and provides project alternatives which reduce or avoid environmental impacts.
Document availability: The EIR is available below or at smud.org/CEQA. Printed copies may be viewed during normal business hours at these locations:
SMUD
Центр обслуговування клієнтів
6301 S Street
Сакраменто, Каліфорнія 95817
SMUD
Операційний центр Східного Кампусу
4401 Бредшоу Роуд
Сакраменто, Каліфорнія 95827
Період громадського обговорення/коментарів
A 45-day public review period for the EIR begins on March 17 through May 2. Email written comments to OvejaRanchSolar@smud.org or:
Кім Кроуфорд
SMUD Environmental Services
PO Box 15830 MS B209
Sacramento, CA 95852-1830
Публічна зустріч
Join us to learn more and provide comments on the proposed project and the EIR:
Thursday, April 10
Sheldon High School Library
8333 Kingsbridge Dr., Sacramento CA 95829
The public meeting is an opportunity for interested parties to provide input on the project, no decisions will be made. Formal comments must be submitted in writing at the public meeting or my emailing OvejaRanchSolar@smud.org by 5 p.m. on May 2.
Документи
- Повідомлення про підготовку
- Фактична довідка про сонячний проект Oveja Ranch
- Повідомлення про наявність
- Проект Звіту про вплив на довкілля
- Appendix Intro: Final NOP and Comment Letters
- Appendix AQ: Detailed Calculation Inputs, Assumptions and Outputs
- Appendix BR-1: Aquatic Resources Delineation Report
- Appendix BR-2: Bio Survey Report
- Appendix BR-3: Burrowing Owl Habitat Assessment and Wintering Owl Surveys
- Appendix CR-1: Cultural Report
- Appendix CR-2: Built Environment
- Appendix HY-1: Water Supply Assessment
- Appendix HY-2: Preliminary Drainage Report
Питання?